Project: 100T Spooler Location: N/A Timeframe: May – June 2007 Scope: Provide the client with a design and manufacturing detail drawings for a 100T Spooler. Services: Design, FE Analysis, 3D Digital prototyping and manufacturing detail drawings
Design, manufacture, installation and commissioning of an access platform
Pump Station Vibration Assessment carried out using FEA and Fatigue
Pumping arrangement was modelled and analysed with CFD
The composters were strain gauged to determine the load profile which